/* * SitePlanAce Proprietary Software * Copyright (c) 2026 SitePlanAce * https://www.siteplanace.com * All Rights Reserved. * * Unauthorized reproduction or redistribution prohibited. */ 2025 California Residential CALGreen Worksheet

2025 California Residential CALGreen Worksheet

Applicant scope worksheet · Based on the AIA California 2025 Residential Mandatory Measures checklist (Sheet 1)

1. Project screening

Is this application for a new residential building or an addition?

This worksheet follows the residential checklist's Section 301.1 scope. The checklist notes that addition/alteration provisions apply to the portions of the building within the permitted scope. Confirm applicability with the enforcing agency and the adopted code.

/* * SitePlanAce Proprietary Software * Copyright (c) 2026 SitePlanAce * https://www.siteplanace.com * All Rights Reserved. * * Unauthorized reproduction or redistribution prohibited. */
Important: This is an applicant screening aid, not an official determination of code compliance. It reproduces and organizes the measures visible on the supplied AIA California 2025 Residential Mandatory Measures, Sheet 1. The image supplied is Sheet 1 only; later checklist sheets and local amendments are not included. Verify the complete 2025 CALGreen Code, applicable California Energy Code / Plumbing Code provisions, local amendments, exceptions, and project-specific applicability with the enforcing agency. For additions, apply measures only to the portions within the permitted scope where the code so provides.
/* * SitePlanAce Proprietary Software * Copyright (c) 2026 SitePlanAce * https://www.siteplanace.com * All Rights Reserved. * * Unauthorized reproduction or redistribution prohibited. */